Renovation

Description

After purchasing a home or commercial premises, renovations are always needed, here we offer solutions in three packages.

What does a total home renovation include?

A. Plumbing

Valsir three-layer multilayer water pipes with a fifty (50) year guarantee from the manufacturer and a hygienic certificate for drinking water.
Heavy Duty PVC Drainage Pipes

 

B. Electrics 

Table - ABB fuses
Sockets, switches LEZARD (white)

C. Tiles

Bathroom and kitchen wall tiles of Italian and Spanish origin, quality A, from a pre-selected range of designs, sizes and colors.

D. Plumbing

D.1 Taps
Mixer tap
Bathtub faucet, shower head, holder
D.2 Flush toilet
Toilet with cistern and soft closing lid.
D.3 Washbasin
Washbasin on a pedestal (up to 60 cm)
Mirror up to 60cm with one shelf/drawer and spotlight.
D.4 Accessories
Paper holder, towel holder single 60 cm and double hook

E. Carpentry

Chipboard boxes with melamine lining, white, 16mm, with 8mm width and PVC along the perimeter on the front side.
Opening doors, made of chipboard with melamine lining, 18mm thick with PVC around the perimeter, in various colors.
Bakelite countertop, heat-resistant and flame-retardant, 4 cm thick, in various colors.
Chest of drawers (3 drawers) simple runners
Hinges on kitchen doors with stopper
Plate holder of suitable sizes for the design
White plastic trash container
Plastic spoon holder
Water collector aluminum sheet
Plastic legs 10cm.
Aluminum colored plastic base.
Handle 9.6 cm
Stainless steel sink with double bottom
Kitchen tap
60cm sliding hood PYRAMIS or TEKA
*The clear design of the carpentry applications is done in collaboration with the customer.

F. Wall painting

VIVECHROM or VITEX COLORS
Double primming and painting

In your home renovation we offer the following extras

PORTABLE TOILET
Respecting the needs of our customers and providing a solution to the problems that arise during the bathroom renovation, we provide you with a portable toilet completely free of charge, for the members of the family who live in the house, until the completion of the project. Just ask for it!

FINDING A RESIDENCE
We undertake to find you the place that will accommodate you, while the renovation works of your house will be done, so that during these days you will feel at home. The cost of the house will always be proportional to your budget. Ask us!
TRANSPORTATION OF FURNITURE
Furniture removal – house emptying by experienced staff to renovate your home, without your own effort and wasted time. We move your things to safe storage areas until the renovation is completed, to avoid damage and to facilitate the work.

Complete Home Renovation - Work Phases

STAGE 1: Strip out

Complete stripping and removal of tiles, old plumbing fixtures, old pipes and other items from the bathroom and kitchen area.

Collection of construction and demolition (C&D) waste

PHASE 2: HYDRAULIC WORKS

Complete installation of water supply pipes (up to the central switch of the house – classic system) and drainage (up to the central drainage of the house) in the bathroom and kitchen areas

Placement of sanitary ware (PC basin-washbasin – batteries – accessories)

Installation and connection of hood, sink and kitchen tap

Testing the installation

PHASE 3: ELECTRICAL WORKS

Checking the electrical installation

Electrical panel replacement (single phase)

Installation of new wiring in the kitchen area

Installation of new sockets and switches throughout the house

Connection of electrical devices (if present in the area)

Transmission of electricity for mirror lighting

Washing machine socket replacing

PHASE 4: TILE WORKS/BUILDING WORKS

Plastering of the bathroom in the kitchen area and other areas of the house (where there are gaps due to the work)

Pouring cement mortar (on the bathroom floor - where necessary due to the stripping)

Tiling the floor and walls of the bathroom

Construction of a built-in shower (in all dimensions)

Tiling between the counter and the high kitchen cabinets

Plaster of all coated surfaces

PHASE 5: WOODWORKS

Construction and installation of new cabinets, shelves and other kitchen units

PHASE 6: OAK FLOOR

Sanding, plastering and varnishing of one (1) bedroom oak floor

 

PHASE 7: PAINTING/OTHER WORKS

Applying styrofoam type plaster to the bathroom ceiling

Smoothing walls with a spatula

Painting (entirely) inside the house on perimeter walls and ceilings

TOTAL COST OF PRODUCTS AND WORKS: €11,800 + VAT

The above offer is adjusted to include works and products depending on the increase in square meters: The price of an 80 m² apartment is 14,800 euros + VAT. For an apartment of 100 m² the cost is €18,000 + VAT.

How do we start?

We first hold an initial meeting where we get to know each other and understand your needs. Then our team will prepare an offer and implementation of the proposal, which will be sent to you by email. After that we will hold a second meeting to discuss the proposal and any questions. If and as long as our proposals cover your request, you accept it, then we proceed with the starting of the renovation work.

Comments

Offer valid for bathrooms up to 20 m². kitchen cabinets with a total area of up to 6 m² and kitchen tiles up to 3 m². Any difference in meters/quantities beyond those specified will be paid additionally by the owner.

The supply of materials (building materials - glues - putties) is included in the package

For any other work or product, please contact the company

The package can be adjusted according to the client's budget

Images are indicative and subject to change without notice

The offer includes the supervision of workshops

24% VAT is not included in the offer

What is included

  1. PLUMBING

Water pipes - multilayer pipe VALSIR three layers of plastic – aluminum. Plastic with a fifty (50) years warranty from the manufacturer and certificate of Drinking Water Hygiene

Drainage pipes P.V.C. heavy type

CIM valves, switches and fittings

  1. ELECTRICAL WORKS

Electrical panel – ABB fuses

Sockets, switches LEGRAND NILOE series in white

  1. TILES

Bathroom and kitchen wall tiles of Italian and Spanish origin, quality A, from a pre-selected range of designs, sizes and colors.

  1. Plumbing

4.1 Taps

Built-in mixer tap from the company TEOREMA

Bathroom mixer tap from the company TEOREMA

4.2 Flush toilet

Low pressure toilet with toilet seat lid from the company HUIDA

4.3 Bathroom furniture

Washbasin on a pedestal (up to 60 cm)

Bathroom furniture up to 80cm with a mirror - a cabinet, a lamp in a pre-selected range of colors and designs

4.4 Accessories

Paper holder, towel holder single 60 cm and double hook

4.5 Shower cabin

Shower cabin - 5mm transparent safety glass

4.6 Heater

Heated towel rail 0.40×1.20

  1. Carpentry

Chipboard boxes with melamine lining, white, 16mm, with 8mm width and PVC along the perimeter on the front side.

Opening doors, made of chipboard with melamine lining, 18mm thick with PVC around the perimeter, in various colors.

Bakelite countertop, heat-resistant and flame-retardant, 4 cm thick, in various colors.

Cabinet of drawers (3 drawers) with stopper

Hinges on kitchen doors with stopper

Plate holder of suitable sizes for the design

White plastic trash container

Plastic spoon holder

Plastic legs 10cm.

Aluminum colored plastic base.

Handle 9.6 cm

Stainless steel sink with double bottom

Kitchen tap

60cm sliding hood PYRAMIS or TEKA

*The clear design of the carpentry applications is done in collaboration with the customer.

  1. WARDROBE

Construction and installation of an opening wardrobe in the bedroom with a total area of 5 sq.m., which includes:

Melamine boxes

Melamine doors

Three drawer chest of drawers

Door brake mechanisms

  1. SECURITY DOOR

Door with double armor made of electro-galvanized steel, kit includes:

20 locking points, 12 mobile and 8 fixed.

Fire clamps for optimal connection between body and sheet

Lock with latch

Sliding door frame with easy change-reposition and additional air barriers for complete coverage of gaps

Door frame

Rubber with wing on the case for maximum breathability and additional arucaflex on the leaf door

Partial opening function with the ability to lock both sides of the door.

Durable ball hinges with height adjustment.

  1. INTERIOR DOORS

8.1. Door structure

The door consists of a wooden FINGERJOINT type frame and an internal stabilizing honeycomb core 0.45 mm thick (perforated honeycomb) from Germany, suitable for sound insulation. The door is covered on both sides with HDF, a material particularly resistant to moisture, 4 mm thick with a CPL coating (continuous pressure laminate).

8.2. Frame construction

The frame is made of 44 mm thick plywood, the window sill is made of plywood. Polyurethane glue with high moisture resistance is used for CPL welding. Standard equipment: Double screw hinges, three color settings Inox- Lock (AGB original)

Standard εξοπλισμός : Μεντεσέδες βιδωτοί διπλοί, τριών ρυθμίσεων (AGB original) χρώματος Inox- Κλειδαριά

  1. PAINTS

VIVECHROM or VITEX COLORS

 

Extra services

PORTABLE TOILET

Respecting the needs of our customers and providing a solution to the problems that arise during the bathroom renovation, we provide you with a portable toilet completely free of charge, for the members of the family who live in the house, until the completion of the project. Just ask for it!

FINDING A RESIDENCE

We undertake to find you the place that will accommodate you, while the renovation works of your house will be done, so that during these days you will feel at home. The cost of the house will always be proportional to your budget. Ask us!

TRANSPORTATION OF FURNITURE

Furniture removal – house emptying by experienced staff to renovate your home, without your own effort and wasted time. We move your things to safe storage areas until the renovation is completed, to avoid damage and to facilitate the work.

 

Work Phases

STAGE 1: Strip out

Complete stripping and removal of tiles, old plumbing fixtures, old pipes and other items from the bathroom and kitchen area.

Stripping and removal of internal doors and front door

Collection of construction and demolition (C&D) waste

 

PHASE 2: HYDRAULIC WORKS

  • Complete installation of water supply pipes (up to the central switch of the house – classic system) and drainage (up to the central drainage of the house) in the bathroom and kitchen areas
  • Placement of sanitary ware (PC basin-washbasin – batteries – accessories)
  • Installation and connection of hood, sink and kitchen tap
  • Testing the installation

 

PHASE 3: ELECTRICAL WORKS

  • Checking the electrical installation
  • Electrical panel replacement (single phase)
  • Installation of new wiring in the kitchen area
  • Installation of new sockets and switches throughout the house
  • Connection of electrical devices (if present in the area)
  • Transmission of electricity for mirror lighting
  • Washing machine socket replacing

 

PHASE 4: TILE WORKS/BUILDING WORKS

  • Plastering of the bathroom in the kitchen area and other areas of the house (where there are gaps due to the work)
  • Pouring cement mortar (on the bathroom floor - where necessary due to the stripping)
  • Tiling the floor and walls of the bathroom
  • Tiling the indoor floor
  • Construction of a built-in shower (in all dimensions)
  • Tiling between the counter and the high kitchen cabinets
  • Plaster of all coated surfaces

 

PHASE 5: WOODWORKS

  • Construction and installation of aluminum frames that includes:
  • Sliding or opening balcony door for living room and bedroom with double glazing, mosquito net and roller shutter or roller (2 pieces)
  • Sliding or opening kitchen window with double glazing, mosquito net and shutter (1 pc)
  • Kitchen door (1 pc)
  • Bathroom window single-leaf opening with double sandblasted, tilt and mosquito net (1 pc.)

 

PHASE 6: OAK FLOOR

  • Construction and installation of new cabinets, shelves and other kitchen units
  • Construction and installation of a new bedroom wardrobe

 

ΦΑΣΗ 7: ΠΟΡΤΑ ΑΣΦΑΛΕΙΑΣ

  • Sanding, plastering and varnishing of one (1) bedroom oak floor

 

ΦΑΣΗ 8: ΕΣΩΤΕΡΙΚΕΣ ΠΟΡΤΕΣ

  • Installation of a new security door
  • Installation of 3 interior doors and an attic door.

PHASE 9: PAINTING/OTHER WORKS

  • Applying styrofoam type plaster to the bathroom ceiling
  • Smoothing walls with a spatula
  • Painting (entirely) inside the house on perimeter walls and ceilings
  • Filling in the places where construction crew intervened e.g. electrician, etc. and the coatings need repairs

 

TOTAL COST OF PRODUCTS AND WORKS: €16,800 + VAT

 

The above offer is adjusted to include works and products depending on the increase in square meters:

The price of an 80 m² apartment is 19,300 euros + VAT.

For an apartment of 100 m² the cost is €23,500 + VAT.

 

How do we start?

 

We first hold an initial meeting where we get to know each other and understand your needs. Then our team will prepare an offer and implementation of the proposal, which will be sent to you by email. After that we will hold a second meeting to discuss the proposal and any questions. If and as long as our proposals cover your request, you accept it, then we proceed with the starting of the renovation work.

 

Comments

 

  • Offer valid for bathrooms up to 20 m². kitchen cabinets with a total area of up to 6 m² and kitchen tiles up to 3 m², indoor floor tiles up to 50m² and bedroom wardrobes up to 5m². Any difference in meters/quantities beyond those specified will be paid additionally by the owner.
  • The supply of materials (building materials - glues - putties) is included in the package
  • For any other work or product, please contact the company
  • The package can be adjusted according to the client's budget
  • Images are indicative and subject to change without notice
  • The offer includes the supervision of workshops
  • 24% VAT is not included in the offer

What is included

 

  1. PLUMBING
    Water pipes - multilayer pipe VALSIR three layers of plastic – aluminum. Plastic with a fifty (50) years warranty from the manufacturer and certificate of Drinking Water Hygiene
    Installation of sink and cooker hood
    Drainage pipes P.V.C. heavy type
    CIM valves, switches and fittings
  1. ELECTRICAL WORKS
    Electrical panel – ABB fuses
    Sockets, switches LEGRAND NILOE series in white
  1. TILES
    Wall and floor tiles in Italian and Spanish A quality, from a pre-selected range of designs, sizes and colors for bathrooms up to 20 m².
  1. Sanitary ware
    4.1 Tap
    Built-in mixer tap from the companies GROHE/MODEA/TEOREMA
    2 bathroom faucets, mixer, built-in by the companies GROHE/MODEA/TEOREMA
    4.2 Toilet
    Wall-hung toilet with softclose toilet seat lid and built-in cistern by GROHE & ROCA
    4.3 Bathroom furniture
    Pedestal washbasin (up to 60 cm)
    Bathroom furniture up to 100cm with a mirror - a cabinet, a lamp and a hanging furniture shelf 30x1.30, in a pre-selected range of colors and designs, or build a built-in cabinet with a shelf and a mirror of the same dimensions.
    4.4 Accessories
    Paper holder, towel holder single 60 cm and double hook
    4.5 Shower cabin
    Shower cabin - 6mm transparent safety glass or acrylic bathtub up to 1.70×0.70
    4.6 Heater
    Heated towel rail 0.40×1.20
  1. WINDOW FRAMES
    EUROPA aluminum frames in white, with GIESSE recalls
    G.U. Locks
  1. Carpentry
    Chipboard boxes with melamine lining, white, 16 mm, width 8 mm, PVC face all around.
    Opening doors made of chipboard with melamine lining, 18 mm thick with PVC around the perimeter, in various colors.
    Bakelite countertop, heat-resistant and flame-retardant, 4 cm thick, in various colors
    Cabinet of drawers (3 drawers) with stopper
    Plate holder of suitable sizes for the design
    White plastic trash container
    Plastic spoon holder
    Water collector aluminum sheet
    Plastic legs 10cm.
    Aluminum Foil Stickers.
    Handle 9.6 cm
    Sink made of stainless steel or technogranite with double bottom.
    Kitchen mixer tap GROHE BAUEDGE
    Cooker hood or sliding hood 60cm (PYRAMIS/TEKA)
    *Clear design of carpentry is carried out with the customer.
  1. WARDROBE
    Construction and installation of an opening wardrobe in the bedroom with a total area of 5 sq.m., which includes:
    Melamine boxes
    Melamine doors
    Three drawer chest of drawers
    Door brake mechanisms
    SECURITY DOOR
    Door with double armor made of electro-galvanized steel, kit includes:
    20 locking points, 12 mobile and 8 fixed.
    Fire clamps for optimal connection between body and sheet
    Lock with latch
    Sliding door frame with easy change-reposition and additional air barriers for complete coverage of gaps
    Door frame
    Rubber with wing on the case for maximum breathability and additional arucaflex on the leaf door Partial opening function with the ability to lock both sides of the door.
    Durable ball hinges with height adjustment.
  1. INTERIOR DOORS
    Door structure: The door consists of a wooden FINGERJOINT type frame and an internal stabilizing honeycomb core 0.45 mm thick (perforated honeycomb) from Germany, suitable for sound insulation. The door is covered on both sides with HDF, a material particularly resistant to moisture, 4 mm thick with a CPL coating (continuous pressure laminate).
    Frame construction: The frame is made of 44 mm thick plywood, the window sill is made of plywood. Polyurethane glue with high moisture resistance is used for CPL welding.
    Standard equipment: Double screw hinges, three color settings Inox- Lock (AGB original)
  1. PAINTS
    VIVECHROM or VITEX COLORS

Extra services

PORTABLE TOILET
Respecting the needs of our customers and providing a solution to the problems that arise during the bathroom renovation, we provide you with a portable toilet completely free of charge, for the members of the family who live in the house, until the completion of the project. Just ask for it!
FINDING A RESIDENCE
We undertake to find you the place that will accommodate you, while the renovation works of your house will be done, so that during these days you will feel at home. The cost of the house will always be proportional to your budget. Ask us!
TRANSPORTATION OF FURNITURE
Furniture removal – house emptying by experienced staff to renovate your home, without your own effort and wasted time. We move your things to safe storage areas until the renovation is completed, to avoid damage and to facilitate the work.

Work Phases

STAGE 1: Strip out

  • Complete stripping and removal of tiles, old plumbing fixtures, old pipes and other items from the bathroom and kitchen area.
  • Stripping and removal of internal doors and front door
  • Removal of old aluminum frames.
  • Collection of construction and demolition (C&D) waste

PHASE 2: HYDRAULIC WORKS

  • Complete installation of water supply pipes (up to the central switch of the house – classic system) and drainage (up to the central drainage of the house) in the bathroom and kitchen areas
  • Placement of sanitary ware (PC basin-washbasin – batteries – accessories)
  • Installation and connection of hood, sink and kitchen tap
  • Testing the installation

PHASE 3: ELECTRICAL WORKS

  • Checking the electrical installation
  • Electrical panel replacement (single phase)
  • Installation of new wiring in the kitchen area
  • Installation of new sockets and switches throughout the house
  • Connection of electrical devices (if present in the area)
  • Transmission of electricity for mirror lighting
  • Collection of construction and demolition (C&D) waste

PHASE 4: TILE WORKS/BUILDING WORKS

  • Plastering of the bathroom in the kitchen area and other areas of the house (where there are gaps due to the work)
  • Pouring cement mortar (on the bathroom floor - where necessary due to the stripping)
  • Tiling the floor and walls of the bathroom
  • Tiling the indoor floor
  • Construction of a built-in shower (in all dimensions)
  • Tiling between the counter and the high kitchen cabinets
  • Plaster of all coated surfaces

PHASE 5: WINDOW FRAMES

Construction and installation of aluminum frames that includes:

  • Sliding or opening balcony door for living room and bedroom with double glazing, mosquito net and roller shutter or roller (2 pieces)
  • Sliding or opening kitchen window with double glazing, mosquito net and shutter (1 pc)
  • Kitchen door (1 pc)
  • Bathroom window single-leaf opening with double sandblasted, tilt and mosquito net (1 pc.)

PHASE 6: WOODWORKS

  • Construction and installation of new cabinets, shelves and other kitchen units
  • Construction and installation of a new bedroom wardrobe

PHASE 7: OAK FLOOR

Sanding, plastering and varnishing of one (1) bedroom oak floor

PHASE 8: SECURITY DOOR

Installation of a new security door

PHASE 9: INTERIOR DOORS

Installation of 3 interior doors and an attic door.

PHASE 10: PAINTING/OTHER WORKS

  • Applying styrofoam type plaster to the bathroom ceiling
  • Smoothing walls with a spatula
  • Painting (entirely) inside the house on perimeter walls and ceilings
  • Filling in the places where construction crew intervened e.g. electrician, etc. and the coatings need repairs

TOTAL COST OF PRODUCTS AND WORKS: €28,000 + VAT

 

How do we start?

Comments

We first hold an initial meeting where we get to know each other and understand your needs. Then our team will prepare an offer and implementation of the proposal, which will be sent to you by email. After that we will hold a second meeting to discuss the proposal and any questions. If and as long as our proposals cover your request, you accept it, then we proceed with the starting of the renovation work.